References

January 2019.

INSTALLATION OF PACKING LINES

Provimi - Cargill - Jordan

Works as a subcontractor

Animal feed and additive industry

Animal feed and additive industry Installation of packaging lines (3 packers in open bags with capacity of 800 vr/h, 2 palletisers with capacity of 1200 vr/h, transport lines in length of about 100 m) - for DREWMAX - client CARGIL - Prvimi (Amman-Jordan)

March 2019.

INSTALLATION OF THE PACKING LINE

PATENT co - Serbia

Works as a contractor

Industrija stočne hrane i aditiva

Installation of packaging line (packer in open bags with capacity of 800 vr/h, palletizer with capacity of 1000 vr/h (mada to google prevodi kao: rpm), checkweigher) - for DREWMAX - client PATENT Co (Subotica Serbia)

April 2019.

INSTALLATION OF PIG FARM EQUIPMENT

Bogatić - Serbia

Works as a contractor

The farm

Installation of pig farm equipment(on a turnkey basis) - for ISV - client Bogatić pig farm. The following equipment is installed: Automatic feeding equipment; Room ventilation equipment;

May - July 2019.

INSTALLATION OF PIG FARM EQUIPMENT

Dombovar - Hungary

Works as a contractor

The farm

Installation of pig farm equipment - for the ISV company - client pig farm Dombovar. The following equipment is installed: Space heating equipment; Pressure washer equipment; Space cooling equipment;

August 2019.

INSTALLATION OF CONTROL EQUIPMENT

Hotel Fruškogorske Terme, in Vrdnik - Serbia

Works as a subcontractor

Installation of equipment for managing the swimming pool operation in the hotel. Installation and connection of electrical cabinets for equipment management.

September 2019.

INSTALLATION OF CONTROL EQUIPMENT

Heating plant Subotica - Serbia

Works as a subcontractor

Installation of equipment for process control of boiler room in Subotica heating plant. Formation, installation and connection of electrical cabinets for equipment management.

August - October 2019.

INSTALLATION OF CONTROL EQUIPMENT

Canal looks, Sebešvok - Serbia

Works as a subcontractor

Installation of process management equipment on the shipping line. Installation of signal cables and power cords of various dimensions and purposes. Formation, installation and connection of electrical cabinets for equipment management. Testing signals, participating in commissioning.

October - November 2019.

REMOVAL OF THE CAN FILLING LINE

Factory TUBORG - Bucharest - Romania

Works as a subcontractor

Can filling line disassembly work. Dismantling of the electrical cabinet for controlling the operation of the bottle filling machine (different size, type and purpose of the electrical cabinet). Preparation of transport equipment.